Website map|Add to favouritesWelcome to Ahead Technology(Shen Zhen) Co.,LTD

AHEAD product
Current location: Home»AheadMold News » Ahead News » The Document And Preparation Before Mold Shippment

The Document And Preparation Before Mold Shippment

Categories: Ahead NewsStars: 3Stars Visit: - Release time: 2016-01-11 16:11:00
Font size:【 Large Middle Small Source: Editor:

The Document And Preparation Before Mold Shippment --- Aheadmold

As plastic injection mold manufacturer, we should make sure the mold meet customer’s requirement. The checking procedure should be followed as below. We have to make sure all document needed are all packed in shipping box.
1, 2D mold assembly drawing with hard copy
2, 2D part drawing with hard copy
3, all the 2D drawing and 3D part drawing with PC copy(Buring in CD disk)
4, Hot runner drawig if have
5, short shot photos and 2 cycle auto injection vedio burn in the CD
6, all the electrodes for mold in case modification in customer side
7, 1 shorts sample for the last trial
8, 1 copy of injection molding parameter
9, steel certificate for core and cavity
10, the dimension measurement report for last samples
11, The hardness treatment certificate for cor and cavity steel
12, one copy nitriding certificate
13, measurement report for mold steels.

Article come from China injection tools manufacturer - AHEADMOLD, website is WWW.AHEADMOLD.COM.

CONTACT

Ahead Technology(Shen Zhen) Co.,Ltd No.36 Shiwei Pinggang Industrial Area, Jiangshi Community,Gongming Street, Guangming New District, Shenzhen, China 518106

Phone: +86-755-23426229

Fax: +86-755-29904981

E-mail:tina@aheadmold.com

Stay in Touch

Sign up for our newsletter to receive event updates and exclusive offers

  • Email Address:
  • Leave your words here: